summaryrefslogtreecommitdiff
diff options
context:
space:
mode:
authorwoochan lee <wc0917.lee@samsung.com>2015-09-09 00:54:56 +0200
committerCedric BAIL <cedric@osg.samsung.com>2015-09-09 07:23:24 +0200
commitcfff788b62d742fee76655026063719dc149f81e (patch)
tree48a1d62fdfd8146be7431628670ff3a32d7078a1
parenta6d1a4cfcd830836f89c6206f33b957c908e2c00 (diff)
calendar: fix signal process timing issue when view update.
Summary: When the calendar view updated(Press next button to activated next month), a lot of signals process(signal emitted) to calendar edc. The signals which related with view update, should process in same loop. If not, the view looks weird. To ensure signals process same time, i called "edje_object_message_signal_process" after layout sizing eval called. @fix Reviewers: Hermet, cedric, woohyun Subscribers: id213sin Differential Revision: https://phab.enlightenment.org/D3019 Signed-off-by: Cedric BAIL <cedric@osg.samsung.com>
-rw-r--r--src/lib/elm_calendar.c2
1 files changed, 1 insertions, 1 deletions
diff --git a/src/lib/elm_calendar.c b/src/lib/elm_calendar.c
index 80c190622..fe0102ad4 100644
--- a/src/lib/elm_calendar.c
+++ b/src/lib/elm_calendar.c
@@ -609,7 +609,7 @@ _populate(Evas_Object *obj)
609 sd->filling = EINA_FALSE; 609 sd->filling = EINA_FALSE;
610 610
611 elm_layout_thaw(obj); 611 elm_layout_thaw(obj);
612 elm_layout_sizing_eval(obj); 612 edje_object_message_signal_process(elm_layout_edje_get(obj));
613} 613}
614 614
615static void 615static void